COMPLETED PROJECTS / DUHOK WATER SUPPLY, TREATMENT PLANT AND TRANSMISSION LINES, 2ND STAGE PROJECT

Employeur Direction générale de l'eau et d’assainissement, ministère des municipalités - Erbil / KRG Lieu Duhok / Iraq Date des Travaux 2009 Fin des Travaux 2012

 

1 - Khrabdeem Water Treatment Plant 266.400 m3/day (11.100 m3 /h)

- Sludge Manholes No.3 & 4 - 2 pcs
- Clariflocculator Tanks No.3 & 4 – 2 Pcs -48.80m Diameter
- Chlorine Contact Tank No.2 - 5500m³ Capacity
- Rapid Sand Filter Buildings No.1 & 2 - 2 pcs
- Backwash Pumping Station
- Transformer Building No.2
- Generator Building No.2
- Chlorine Store Building
- Chemical Dosing Building
- Laboratory & Control Room

2 - Sumail New Pump Station

- Water Reservoir - 15.000m³ Capacity
- Pump Station No.2
- Surge Tanks
- Elevated Water Tank
- Chlorine Dosing Building
- Transformer Building
- Generator Building
- Workshop Building
- Office Building
- Guard House & Septic

3 - Masiek Water Resevoir and Pump Station No.3

- Water Reservoir - 25.000m3
- Pump House
- Transformer Building
- Generator Building
- Staff House
- Guard House & Septic

4 - Zawah Water Reservoir (10.000 m3)
5 - Sharia Water Reservoir (1.000 m3)
6 - Domez Water Reservoir (1.000 m3)
7 - Faida Water Reservoir (1.000 m3)
8 - Nizari 1 Water Reservoir (7.500 m3) and Pump Station No.4

- Water Reservoir - 7.500m3
- Pump House
- Transformer Building
- Generator Building
- Staff House
- Guard House & Septic

9 - Nizari Water Reservoir (7.500 m3)

10 - Grebassy Water Reservoir (15.000 m3) and Pump Station No.5

- Water Reservoir - 15.000m3
- Pump House
- Transformer Building
- Generator Building
- Staff House
- Guard House & Septic

11 - Jameeya Water Reservoir (1.000 m3)

12 - Spiral Welded Steel Water Transmission Lines

- DN1200 - 14.900 m
- DN900 - 10.900 m
- DN700 - 13.000 m
- DN600 - 3.840 m
- DN550 - 4.350 m
- DN400 - 5.740 m
- DN300 - 17.870 m
- DN250 - 1.000 m
- DN200 - 1.000 m
- Cathodic Protection for Transmission Lines

13 - Service Roads - 47 km

14 - Transmission Line Pipe Bridges - 61m & 70m long

15 - Over Head Line - 11 kV - 8,97 km

16 - PLC & SCADA System


ICON Algı Yönetimi ve Bilişim Sistemleri